© 2017 by Unimi Solutions. Proudly created with Wix.com

  • Twitter - Grey Circle
  • LinkedIn - Grey Circle

E.ON BY THE ROYAL CASTLE IN STOCKHOLM

The German based Energy and Utility corporate E.ON have used unimi-1BaseTM in their roll-out of charging stations in Sweden. Their flagship installations are at Strandvägen and by the Royal Castle in central Stockholm. In the installation E.ON needed to consider an easy installation with as small as possible disturbance to the surrounding traffic and tourist pedestrians while at the same time making sure that the final result meant good aesthetics design and solid anchoring to minimize any future ground work.  

1/5